CUT OPTIMIZATION | ||||
---|---|---|---|---|
This is the relatively easy 1-dimensional case (pipe, lumber, etc.) My example is a trestle for my garden railroad. This requires many pieces of defined lengths that make up the bents that are combined to make a complete bridge. © Copyright 2017 by Russell Shilling | ||||
Job Name | Algorithm | |||
Cut Group | CALCULATED RESULTS | |||
Stock Length | Material Qty | |||
Stock Qty | Waste Total | |||
Kerf Width | Waste Percent | |||
Usable Minimum | Usable Total |
Piece | Length | Quantity | ||
---|---|---|---|---|
New | len | qty |
# | Waste | Stock | Piece | Length | Piece | Length | Piece | Length |
---|---|---|---|---|---|---|---|---|
cut | waste | stock | piece | len | piece | len | piece | len |